วันอาทิตย์ที่ 9 เมษายน พ.ศ. 2560

Split phase motor check Run winding and startwinding

Split phase motor check Run winding and startwinding





Adjust the mulitimeter R x1
Use a multimeter to measure the runwinding and startwinding , choose one of motor wire to touch all three multimeter wires one by one. If the needle show when the motor wire touch any multimeter wire,so we can check the resistance,then record the resistance.  Next do the same method to the rest two wires. 



Runwinding  resistance low.
Startwinding resistance hight.


วันเสาร์ที่ 25 มีนาคม พ.ศ. 2560

Push Button Switch

Push Button Switch Check

Adjust the multimeter Rx1.
1. Check the normally open : NO.
    If the needle of the multimeter does not shows. Press at the push button switch.If the needle of the multimeter show, it meaus that the NO work normally.

                                        

                                                                   Push Button Switch 




Press at the push button switch.

2.  Check the normally close : NC
      If the needle of  the multimeter  shows. Press at the push button switch.If the needle of the multimeter does not shows, it meaus that the NC work normally.




Press at the push button switch.



วันอาทิตย์ที่ 19 มีนาคม พ.ศ. 2560

FUSE CHECK

FUSE  CHECK

Adjust  the multimeter  R x 1
Use a multimer to measure the fuse at the head and end of the fuse. If the needle of the mulmiter shows,it maus  that the fuse work normally.







วันพฤหัสบดีที่ 9 มีนาคม พ.ศ. 2560

Motor Control

Motor  Control

Motor  control  equipment.
      1.  Push button switch.
      2.  Emergency push button switch.
      3.  Llluminated push button switch.
      4.  Magnetic  contactor.
      5.  Relay.
      6.  Overload relay.
      7.  Timing relay.
      8.  Selector switch.
      9.  Pressure switch.
      10.Limit  switch.
      11.Float  switch.
      12.Signal  lamp.